Woowon Development, Civil construction-specialized Company

With Woowon's strength and technology to change the landscape

Boryung Taean Undersea Tunnel Zone 1
Quality Control Management

We consistently enhance our quality control to satisfy our clients.

Innovation

We create innovative values based on our knowledge

Major Projects

Road

Starting with Jungbu Expressway, we participated in most national highways and expressways completing 65 constructions and over 350km in length.

We achieved several awards for our best quality and technology, and we are currently executing 15 projects including the Second Youngdong Expressway

MORE

Railway/Subway

We have completed approximately 33 constructions of railwayd and subways through the cities which requires high technical skills. Using the NATM Method based on our accumulated skills, we are currently executing 7 railway constructions and 4 subway constructions.

MORE

Complex

We have completed 15 complex constructions in addition to housing site construction at a 400 million m2 scaled Daewoo car factory in Gunsan, 660,000 m2 scaled Cheonan Commercial Residential Site Development Construction, National Public Housing Complex in Noeun, Daejeon, and Choongju High-tech Regional Industrial Complex. Currently, we are executing the Gumi high-tech Valley Sites and the utility construction at the US military base in Pyeongtaek.

MORE

Port/river

Using the Caisson Method working as high as a 15-story apartment in Korea, we have successfully begun and completed 3 port constructions including Youngil New Port's breakwater construction and Gunjang New Port's quay wall construction. We also completed 2 river conservation work in addition to Jukjeon reservoir and Daecheong Dam's emergency spillway

Using the off-shore steel pipe sheets pile driving method, we are currently reconstructing Wharf #1 (Berth #12) of Pohang New Port.

MORE

Dam

We are currently executing the construction to expand the flood-control capacity of Choongju Dam.

MORE

Plant

We have successfully completed many plant constructions including, Uljin Nuclear Power Plant Unit 5,6, Gwangyang Steel Mill's Sintering Factory, Ildo Combined-Cycle Power Plant, Hwadong Thermal Plant Unit 1,2, Sancheong Pumped Storage Power Plant Facility, Incheon LNG Excavator, Yangyang Pumped Storage Power Plant, Cheongsong Pumped Storage Power Plant, and Dangjin 2 Naengyoung Factory. Currently, we are executing the facility construction for Singori Nuclear Power Plant.

MORE

Overseas Construction

We have successfully executed the tunnel construction in Lowari, Pakistan, and pile driving and inner wall construction work in Nigeria

MORE

Results

Earthworks and structures (tunnel) in Chuncheon Sokcho Railway Roadbed Section 7

Name
Earthworks and structures (tunnel) in Chuncheon Sokcho Railway Roadbed Section 7
Period
2022.07.12 ~ 2027.06.30
Main-Contractor
Hanwha Construction Co., Ltd.
Project Overview
tunnel construction

Seoul Metro Line 7 Cheongna International City Extension Section 5 under construction Earthworks, structure construction

Name
Seoul Metro Line 7 Cheongna International City Extension Section 5 under construction Earthworks, structure construction
Period
2022.07.08 ~ 2027.10.17
Main-Contractor
Kolon Global Co., Ltd.
Project Overview
Tunnel construction, 1 tunnel stop, 3 vertical exits

Goyang Changneung Public Housing District Changneung Station New Earthwork and Structure Construction

Name
Goyang Changneung Public Housing District Changneung Station New Earthwork and Structure Construction
Period
2022.04.11 ~ 2024.06.30
Main-Contractor
SK Eco Plant Co., Ltd.
Project Overview
Tunnel construction, 1 station, 2 vertical exits

Dongtan-Indeokwon Double Track Railway Section 9 Construction

Name
Dongtan-Indeokwon Double Track Railway Section 9 Construction
Period
2021.04 ~ 2026.04
Main-Contractor
Hanwha E&C
Project Overview
Section, tunnel 112 stops, main line ventilation holes 2 places

Earthworks and structure work (section C) among the Shinansan Line double-track railway PPP project, Section 3-2

Name
Earthworks and structure work (section C) among the Shinansan Line double-track railway PPP project, Section 3-2
Period
2021.08 ~ 2025.04
Main-Contractor
POSCO E&C
Project Overview
Main tunnel, 1 station, 2 vertical tunnels, connection tunnel

Earthworks and reinforced concrete work in section 1 of the National Assembly-daero underpass and upper park (Phase 2) construction work

Name
Earthworks and reinforced concrete work in section 1 of the National Assembly-daero underpass and upper park (Phase 2) construction work
Period
2021.05 ~ 2024.12
Main-Contractor
Kolon Global Co Ltd
Project Overview
Earthworks and reinforced concrete construction

Vertical section and tunnel construction section 1 of the Shinansan Line double-track train (section 5-1)

Name
Vertical section and tunnel construction section 1 of the Shinansan Line double-track train (section 5-1)
Period
2021.04~2024.12
Main-Contractor
Lotte Construction Co Ltd
Project Overview
Vertical hole and tunnel construction

Earthwork and Structure Construction (Section B) for Zone 3-2 of the Sinansan Line Double Track Railway Private Investment Project

Name
Earthwork and Structure Construction (Section B) for Zone 3-2 of the Sinansan Line Double Track Railway Private Investment Project
Period
2021.02 ~ 2025.04
Main-Contractor
POSCO E&C
Project Overview
Earthwork and structural work
  • Earthworks and structures (tunnel) in Chuncheon Sokcho Railway Roadbed Section 7 in progress
  • Seoul Metro Line 7 Cheongna International City Extension Section 5 under construction Earthworks, structure construction in progress
  • Goyang Changneung Public Housing District Changneung Station New Earthwork and Structure Construction in progress
  • Dongtan-Indeokwon Double Track Railway Section 9 Construction in progress
  • Earthworks and structure work (section C) among the Shinansan Line double-track railway PPP project, Section 3-2 in progress
  • Earthworks and reinforced concrete work in section 1 of the National Assembly-daero underpass and upper park (Phase 2) construction work in progress
  • Vertical section and tunnel construction section 1 of the Shinansan Line double-track train (section 5-1) in progress
  • Earthwork and Structure Construction (Section B) for Zone 3-2 of the Sinansan Line Double Track Railway Private Investment Project in progress