Vertical section and tunnel construction section 1 of the Shinansan Line double-track train (section 5-1)

Name
Vertical section and tunnel construction section 1 of the Shinansan Line double-track train (section 5-1)
Period
2021.04~2024.12
Main-Contractor
Lotte Construction Co Ltd
Client
Nexttrain Co Ltd
Project Overview
Vertical hole and tunnel construction